Construction Site
|
Taking out dirt
|
Taking out more dirt!
|
|
|
|
Forms for concrete flooring for
structural columns
|
Hole where the new elevator will be located
|

|
|
|
|
GPS transmitting information
to the CAT
|
Preparing rebar for construction site
|
Frames and Concrete Pouring
|
|
|
|
Forms Built and Concrete Pouring
|
Concrete Truck
|
Forms Removed from Concrete Walls
|
|
|
|
Frame for Future Stairs to 2nd Floor
|
Prepping for Concrete Floor Pour
|
Laying 1st Floor Concrete Flooring
|
|
|
|
Laying 1st Floor Concrete Flooring
|
Laying 1st Floor Concrete Flooring
|

|
|
|
|
Electrical Room being built on 1st floor
|
Cement Mixer
|
Structural beams coming off truck
|
|
|
|
Structural beams being placed for assembly
|
Assembly of the structural beams
|
Assembly of the structural beams
|
|
|
|
Glulam Beams going in
|
Glulam Beams
|
1st Floor Wall Framing
|
|
|
|
1st Floor Stairs heading up to 2nd Floor
|
1st Floor Stairs heading up to 2nd Floor
|
2nd Floor Distribution Center Mezzanine
|
|
|
|
2nd Floor EcoSystem Area
|
West side of building
Front Entrance
|
South side of the building
|
|
|
|
Exterior Construction Photo 1st & 2nd Floor
|
Exterior Construction Photo
|
Welding side infrastructure
|
Attaching side metal frames
|
Trusses being installed above the 3rd floor
|
Attaching side metal frames
|
Attaching insulation
|
Insulation on sides of building
|
Stairwell framing
|
|
|
|
Adding bricks to side/front of the building
|
Adding brick to building exterior
|
Adding exterior siding
|